The challenge was we needed to replace a 1,000' long conveyor belt that was hauling coal at a rate of 3,000 tons/ hour. This belt was the main feed belt for the 1,200 MW coal fired power plant. This project presented many obstacles that JGM, the client and the design team needed to overcome.